  1. Week of October 12: Final review passed, BOM locked in

    The board passed its final design review, the bill of materials got finalized with a call on brokers for a few shortage-hit ICs, and the motor control board's driver spacing got wrapped up.

  2. Week of October 5: LVDS tuning, test points, and silkscreen

    Two days of PCB work, checking LVDS length tuning and filtering the power input, then sorting out test points, passing a preliminary design review, and cleaning up silkscreen.

  3. Week of September 28: Impedance profiles and the power section

    A short PCB week, getting the impedance profiles set up in Altium and laying out the power section of the board.